A fresh drill working freely for a few parts before binding again does not necessarily indicate a soft guide bushing. Packed chips beneath the bushing are a reason to inspect the layout. Close support helps guide the tool, but a blocked exit traps swarf; excessive separation leaves more unsupported drill length.
Quote the actual sequence
Give the jig maker the material, diameter, depth, drilling and reaming sequence, tool types, coolant arrangement and cycle requirement. Hole coordinates alone do not describe the job. A drill-then-ream operation may need interchangeable guides of different bores or lengths instead of one oversized bushing for both tools.
Follow the chip path out of the fixture
Inspect the section bounded by the bushing end, part surface and neighboring clamps. Stringy and fragmented chips behave differently. Select clearance using the bushing supplier's guidance and a trial in the actual material. A clamp must not close the exit, and a thin workpiece needs nearby support that still permits drill breakthrough.
Make replacement preserve the datum
For a renewable guide, specify its liner fit, retention and seating check rather than repeatedly driving a worn guide out of an aluminum plate. Inspect the installed guide axis relative to the workpiece locators. A perpendicular bushing bore by itself does not demonstrate that the resulting hole will be in position.
Accept a sequence of drilled parts
On the approved guarded equipment, run the agreed number of consecutive pieces. Record diameter, position, burrs and abnormal withdrawal. Perform clearing, measurement and bushing changes under the equipment's stop procedure. Send Vietlink Precision the part drawing, tool list, sample and expected replacement frequency to distinguish the base, liner and consumable guide in the quote.