Two bores can pass their diameter checks without lying on the same axis. When a lid stiffens halfway through its travel, establish whether it binds at loose fit-up, only after tightening or only under its own weight. Enlarging both holes can hide the problem and introduce sag.

Draw the fixed and moving members together

Show which leaf retains the pin, which is free to rotate, and the offset from each mounting pad to the intended axis. Include finished panel thickness, coating and shims. Two pads on different steps do not share the same height simply because they use identical hinges.

Check alignment before and after tightening

Support the lid. Where the design provides accessible clearance bores, try a straight inspection pin of the agreed diameter with the leaves lightly seated. Repeat as the mounting screws are tightened in the specified sequence and to the specified torque. New drag points to pad seating, burrs, shims or panel distortion. Do not drive a gauge through a retaining interference fit.

Investigate a tight spot at one angle

Sweep the unloaded assembly, then test with the actual lid weight and orientation. A repeatable tight spot calls for inspection of rub marks on the lip, enclosure or seal. If the far corner sags into the latch, record hinge spacing and the lid's mass and center of gravity before changing bore clearance.

Order two complementary checks

The dimensional record covers bore size, axis offset and pad position. The assembly test covers full travel, end clearance and opening force if specified. Send the lid and enclosure drawings, hardware, weight, mounting orientation and operating arc with the RFQ.

Technical references