A turned shaft may meet every diameter tolerance and still fail assembly if a cross-hole or flat is clocked incorrectly. The challenge is the relationship between rotational datums, axial location and secondary milling features. Process planning should define one functional datum system that survives each setup and can be recreated during inspection.
Define the functional datum chain before choosing setups
Identify which bearing journal establishes the rotational axis, which shoulder controls axial position and which feature defines angular zero. If the drawing leaves clocking ambiguous, clarify it before machining. Add protected center, pilot or fixture features only when they do not change part function and are approved.
Preserve the turning axis during secondary milling
Complete related journals and shoulders in one turning setup where possible. For the cross-hole or flat, locate from finished journals using collet, soft jaw, V-block or between-center support, and establish angular orientation with a positive stop or probed feature. Control clamping so a slender shaft is not bent; deburr the cross-hole without rolling an edge into the bore.
Inspect relationships, not isolated sizes
Diameter, hole size and flat width alone do not confirm assembly. Measure journal runout, axial position, cross-hole axis, flat angle and their relation to the functional datum. A rotary CMM setup or dedicated V-block gauge can improve access and repeatability. Vietlink Precision can manufacture shafts and matching inspection fixtures, with reports tied to drawing revision and datum definition.