Making one successful prototype is not the same as producing a repeatable batch. Ramp-up needs control over datum, setup time, inspection and engineering changes.
What needs control
A prototype proves shape and function. A low-volume batch also needs setup time, repeatability, tool life and inspection control.
Key technical point
Before releasing a batch, check critical dimensions, hole positions, fitting surfaces, burrs and assembly condition.
Impact on production
When quantity increases, fixtures or soft jaws reduce alignment time and hold the same datum.
How Vietlink Precision supports
Vietlink Precision can support prototypes, design adjustments, low-volume batches and repeat production.